HomeTransportFour Tube lines face weekend closures as engineering works hit

Four Tube lines face weekend closures as engineering works hit

Published at 6:03am

Four London Underground lines face major disruption this weekend as planned engineering works take hold, with the Metropolitan line shut entirely and the Elizabeth line also affected.

The Circle, District, Metropolitan and Hammersmith & City lines will all be affected by track work on Saturday and Sunday, November 28 and 29. Passengers are being advised to check before they travel and allow extra time for their journeys.

There will be no service on the Circle line between Hammersmith and Tower Hill, and between Edgware Road and High Street Kensington. The District line will be closed between Edgware Road and High Street Kensington, and the Hammersmith & City line will be shut between Baker Street and Aldgate.

The Metropolitan line will have no service on the entire line for the whole weekend.

Alternative Tube services or local bus routes are recommended for all of these routes, and passengers should check live departure boards before setting out.

The Elizabeth line will also be disrupted due to Network Rail maintenance. Rail replacement buses will run on various routes, including between Ealing Broadway and Slough, Slough and Maidenhead, and Stratford and Romford.

The closures affect some of the busiest shared sections of the network. The Circle, District and Hammersmith & City lines all run through the corridor between Edgware Road and High Street Kensington, so passengers travelling across central London on Saturday and Sunday will need to find another way through that stretch.

On the Elizabeth line, the disruption affects both ends of the route. On the western side, rail replacement buses will cover Ealing Broadway to Slough and Slough to Maidenhead, while on the eastern side buses will run between Stratford and Romford. Passengers heading to Heathrow should check whether their Elizabeth line service is running before travelling.

The closures come as London’s transport network returns to normal after this week’s Tube strike. The 24-hour RMT strike, which shut the Circle and Piccadilly lines on Thursday, ends at 11.59am on Friday, with normal service expected to resume by around 6pm.

Further strike dates are planned for December 17 and 19, January 4 and 6, and February 17, 23 and 25, unless a settlement is reached in the dispute over a voluntary four-day week.

Weekend engineering works are a regular feature of the Tube network, with TfL carrying out track renewals, signalling upgrades and station improvements while fewer passengers travel. This weekend’s programme is one of the biggest of the year so far, hitting four lines at once.

Passengers travelling to Heathrow should note that the Piccadilly line, which serves the airport, is not listed among the lines affected by this weekend’s engineering works.

Read more: Tube strike today: Circle and Piccadilly lines shut

Read more: Blackwall Tunnel southbound to close for three long weekends

Sophie Turner
Sophie Turner
Sophie Turner covers transport, major developments, education and council affairs for London Streets.
RELATED ARTICLES

Most Popular