All lanes were temporarily held on the M25 clockwise just after junction 28 for the A12 near Brentwood on Friday afternoon after a car broke down, leaving drivers facing long delays on the orbital motorway.
The hold came just after the Brook Street Roundabout junction, with congestion stretching back to junction 27 for the M11 as traffic built up behind the stricken vehicle. Junction 28, at Brook Street Roundabout, is where the M25 meets the A12, the main route from London into Essex.
It was a second, separate incident at the same junction area on a difficult day for the M25. Earlier on Friday, the crash on the QE2 Bridge had sent queues back towards the same Brook Street junction, with traffic at one point stretching as far as J28 for the A12. That crash has since cleared, with all lanes reopening on the bridge, although long delays remained, with congestion back towards J29 at Romford.
The QE2 Bridge crash, first reported at around 10.41am, involved four vehicles on the A282 in Thurrock and left three lanes closed on the clockwise carriageway between junction 31 at Lakeside and junction 1A at Dartford. At its worst, queues stretched back towards Romford, and later as far as Brook Street Roundabout, before the lanes reopened in the afternoon.
Earlier in the day, two cars crashed on the anticlockwise carriageway after junction 24 at Stagg Hill, near Potters Bar, closing a lane and leaving queues of around two miles. The incident later escalated, with all traffic stopped on the anticlockwise carriageway as emergency services attended the scene.
A coach crash on the M3 London-bound before its junction with the M25 also closed two lanes on Friday, with congestion stretching back to junction three at Lightwater and delays of up to 25 minutes. The crash, first reported at 12.29pm, was at Thorpe Green in Surrey.
The disruption came as drivers were already facing a weekend of closures on the M25, with 16 closures planned across the Friday to Sunday nights, including the QE2 Bridge shutting overnight on Saturday as part of the planned works.
No injuries were reported in connection with the broken-down car near Brentwood, and no time was given for how long the hold would last. Traffic reports described it only as a temporary hold while the vehicle was dealt with, leaving drivers facing delays on a motorway that had already seen disruption through much of the day.

