Motorists face disruption on some of London’s main roads in the run-up to Christmas, with restrictions on the A406 North Circular, the A40 and the A41, and overnight maintenance on the M25 and other motorways.
With Christmas shopping, festive events and the busy December getaway approaching, Transport for London has confirmed a series of restrictions, while several other routes will have roadworks going into December. National Highways is also carrying out overnight maintenance on motorways and major A roads, including routes used by drivers travelling into and out of London.
North Circular and Brent Cross
Drivers using the North Circular near Brent Cross face disruption due to ongoing flyover renewal works. TfL has confirmed restrictions around the junction of the A406 North Circular and A41 Hendon Way, including lane closures on Hendon Way until 21 November and restrictions affecting the eastbound A406 exit slip road.
A contraflow system is also scheduled on Hendon Way until 30 November. The works have already caused delays around Brent Cross, with traffic queuing towards Staples Corner, and motorists are advised to allow extra time or consider alternative routes.
Drivers around Brent Cross have already been facing delays from the flyover safety works, which have been running for several weeks.
West and central London
Drivers heading west out of central London could experience delays on the A40 Westway, where the westbound carriageway between Edgware Road and the Northern Roundabout has been reduced to two lanes for infrastructure inspection works, scheduled to continue until Saturday, 5 December.
Motorists heading into central London for Christmas shopping should also be aware of major changes to Oxford Street. TfL has confirmed that the road is closed to general traffic in both directions between Portman Street and Portland Street as part of the pedestrianisation scheme. Unlike temporary Christmas roadworks, the restrictions are intended to be permanent.
Drivers travelling eastbound along Marylebone Road could face delays because of electrical works, with a lane closure at the junction with Allsop Place scheduled to continue until Monday, 23 November. In the City, temporary traffic signals and lane restrictions are in place in both directions on Cheapside at the junction with King Street for construction work, until Sunday, 20 December.
Drivers near Euston station should be aware of a southbound road closure on Eversholt Street, between Crowndale Road and Euston Square, needed for water main replacement works until Wednesday, 30 December.
North, south-east and Wembley
Drivers in north London could face delays on the A1010 High Road near White Hart Lane, where temporary traffic signals are operating in both directions to allow UK Power Networks to carry out electrical works until Friday, 4 December. Lane restrictions are also in place on Harrow Manorway at the junction with Overton Road, linked to bridge improvements, until the same date.
Motorists travelling through Wembley face disruption on Ealing Road, where temporary two-way traffic lights are in operation between Mount Pleasant and Braemar Avenue for Cadent Gas works, scheduled to continue until Sunday, 13 December, with TfL warning that delays are possible.
Drivers in Shepherd’s Bush could experience delays due to cycleway improvement works, with restrictions on Wood Lane between the A40 Westway and South Africa Road until Friday, 18 December. Separate southbound lane restrictions between South Africa Road and Fountain Park Way are expected to remain until 8 January 2027.
In south-east London, Bexley High Street is closed in both directions between Parkhill Road and Bourne Road to allow water main replacement works, scheduled to continue until 29 January 2027. In Sidcup, the northbound carriageway on Elm Road is closed at the junction with The Green because of Thames Water works, until Thursday, 26 November.
Motorways overnight
National Highways is carrying out planned maintenance on the M25, A2 and other major routes around London. These closures generally take place overnight, often between 8pm and 6am, although exact times vary. National Highways publishes confirmed closures on a rolling seven-day basis, meaning a complete schedule for every night before Christmas is not yet available.
Drivers are advised to check the latest closure report before travelling, particularly if using the M25, A2 or connecting motorways late at night. TfL publishes live traffic updates covering major roads across London, while National Highways provides information about planned motorway and major A-road closures.
As rail passengers found on Sunday, when lines through Wimbledon were closed all day, planned works can change at short notice — so drivers travelling during the Christmas period should check the latest information before setting off, and be aware that additional temporary restrictions may be introduced for festive events, emergency works or traffic management.

